Scheduler is an extension for Siemens Polarion ALM that turns a work-item query into a schedule you can drag. You add the Scheduler widget to a Polarion Rich Page, point it at a query, and the board renders in place: a day-by-day timeline in which every work item with dates becomes a task bar, laid out across swimlane rows. Rows are resources. By default there is one row per project user, taken from the work item’s assignee; alternatively the rows can be the options of an enumeration field, so the board groups by team, component, or any other enumeration you already maintain. Each row carries a per-day load marker showing booked effort against available capacity, so over-allocation is visible before the plan is committed. Work items that match the query but are not scheduled yet wait in the Unplanned sidebar. Drag one onto a row and it is scheduled on that date and assigned to that resource in a single gesture. Dragging an existing bar moves it, and dependencies between tasks are stored as real Polarion work-item links that the board can draw as arrows. Every change writes straight back to Polarion as you make it — there is no Save button on the board.
Scheduler board on a Polarion page showing day columns from Jul 30 to Aug 12, swimlane rows for seven project users, two task bars on the Ayato Seller and Chaitali User rows with salmon-coloured over-capacity load markers above them, and the Unplanned sidebar listing unscheduled work-item cards

A Scheduler board: day columns across the top, one swimlane row per user, task bars with per-day load markers, and the Unplanned backlog on the right.

Quick Navigation

Getting Started

Install the extension, create the demo project, build your first board, and schedule your first task.

Concepts

Understand the timeline, swimlanes and resources, capacity and load, dates and effort, and dependencies.

Guides

Task-oriented instructions for adding the widget, configuring swimlanes, scheduling, linking, filtering, and advanced configuration.

Reference

Widget parameters with their defaults, every toolbar control, the colour and load bands, and the administration pages.

FAQ

Answers to the questions that come up most often when a board does not behave the way you expect.

Key Features

  • Timeline of scheduled work items — day columns with a month and day header, zoom in and out in fixed steps, and a red line marking today; weekends are hidden by default
  • Resource swimlanes — rows built from project users (Assignment Type Users (Assignee)) or from the options of an enumeration field (Enumeration Field plus a Field ID)
  • Per-day resource load — each row cell shows booked effort against capacity in one of four colour bands, from empty through to over capacity
  • Unplanned backlog sidebar — unscheduled matches grouped under their parent work items, with saved-query, swimlane, resolved and free-text filters and a live item count
  • Drag to schedule and reschedule — drop a card from the sidebar to schedule and assign it; drag a bar to move it; changes save automatically
  • Create work items on the timeline — when Enable Create New is set, double-click or drag on an empty row to create a work item of the configured type
  • Dependency links — connect two tasks and Scheduler writes a real Polarion “depends on” link; Show Dependencies draws the arrows over the board
  • Unplan without deletingUnplan item clears a task’s schedule and returns it to the sidebar; the work item itself is untouched
  • Configured from widget parameters — the query, swimlanes, date and duration mapping, effort mode, card height, tooltip fields, and the timeline window are all widget parameters
  • Polarion-native — clicking a task opens it in Polarion’s work item properties sidebar, and a per-item script can make individual tasks read-only