How to read a task card in Nextedy SCHEDULER: what each part of the card shows, which state wins when several apply, and the four load bands with their thresholds.
Almost everything Scheduler tells you at a glance, it tells you with colour: whether a task is finished, whether it is late, and whether the person it sits on can actually absorb it.
This page is the key to those colours, and to the card that carries them.
A card on the timeline packs a work item into the width of its schedule.
Reading it from left to right:
Part
What it shows
Colour bar
The band of colour along the card, carrying the state colour resolved in Which colour wins below
Resolution checkbox
Polarion’s own resolution indicator for the work item
Work-item type icon
The icon of the work item’s type
Work-item ID
The ID, rendered as a link. Clicking it opens the work item in a new browser tab
Title
Follows the ID, separated by a dash
Fields line
Right-aligned on the card: the effort figure selected by the Plans Type parameter (for example 5d), then the work item’s status icon
The card’s height is set by the Card Height parameter, 50 pixels by default.
Raise it when your titles or effort figures need more room — see Widget Parameters.
With Plans Type set to Remaining Estimate + Time Spent, the fields line shows the remaining estimate followed by the combined figure in parentheses.
If neither a remaining estimate nor time spent is recorded, it falls back to the initial estimate.
Hovering a card on the timeline reveals two handles:
Handle
What it does
Add Link
Chain icon. Arms the two-click dependency gesture — click this handle on the first task, then the same handle on the second to connect them. Present only when the widget has at least one entry in Dependency Roles
Unplan item
Calendar-with-a-cross icon. Clears the task’s schedule so the card returns to the Unplanned sidebar. The work item itself is not deleted, and there is no confirmation dialog
A hovered card: the Add Link chain and Unplan item calendar-with-a-cross handles top right, and the hover tooltip underneath with the title, the date range, and the configured Tooltip Fields.
Neither handle appears on cards in the Unplanned sidebar — those cards are dragged onto the board rather than edited in place.
A resolved work item is read-only on the board: its card cannot be dragged, and the Unplan item handle is not offered.
To reschedule it, reopen the work item in Polarion first.
Clicking the body of a card — anywhere other than the ID link or the handles — opens the work item in Polarion’s work-item sidebar, and the board remembers your selection across a reload.
Several states can apply to the same task at once, so Scheduler resolves them in a fixed order.
The first match decides the card’s colour:
1
Overloaded -- red
The task asks for more hours than its swimlane can absorb over the days the bar spans.
This wins over everything else, including a resolution: an overloaded card is red even if it is finished.
2
Resolved -- grey, read-only
The work item has a resolution set.
Grey also means the card is read-only: it cannot be dragged, and it offers no Unplan item handle.
3
Overdue -- red
Today is past the work item’s due date.
An overdue task also adds a red Overdue line, with the due date, at the bottom of its hover tooltip.
4
Otherwise -- the work item's status colour
With none of the above applying, the card takes the colour configured for its status in the project’s work-item status enumeration.
This is the normal case, and it is why a healthy board reads like your Polarion statuses rather than like a traffic light.
Three of the four outcomes on one board: an overloaded card in red at the top, status-coloured cards in the middle, and a resolved card in grey with a struck-through ID at the bottom.
Because overload is evaluated per day and re-evaluated whenever the board redraws, a card can change colour without the work item changing.
Dragging a neighbouring task off a busy day, or shortening it, is enough to take a red card back to its status colour.
In the timeline view, every day cell of a swimlane’s summary row carries a load marker: the hours scheduled into that day for that swimlane, over the swimlane’s capacity for the day — for example 15.3 / 8.
The marker’s background is one of four bands:
Band
Colour
Day load
What it tells you
No load
Grey #E0E0E0
Zero — no effort booked
Nothing with recorded effort sits on the swimlane that day
Light
Light blue #CFF5FC
Up to 50% of capacity
Comfortably below capacity, with room to take work on
Normal
Light green #DCFBB9
Over 50% and up to 100% of capacity
Well used, at or under capacity
High
Salmon red #FFC6B5
Over 100% of capacity
Overloaded — more hours scheduled than the day can hold
Markers in the High band: 15.3 / 8, 13.3 / 8 and 10.8 / 8 are all past an eight-hour day, so every cell is salmon red — the rows with nothing scheduled print no figures at all.
Capacity depends on what the swimlane represents:
Swimlane mode
Capacity per day
Users (Assignee) — one row per user
8 hours
Enumeration Field — one row per enumeration option
24 hours
Enumeration rows are filled against a 24-hour day rather than a working day, so their markers turn red far later than a user row’s would.
Read them as a relative picture of where work is piling up, not as a person’s workload.
See Capacity and Load.
A task’s effort — the figure chosen by Plans Type — is spread across the working days its bar covers, and each of those days receives its share.
Two consequences worth knowing:
A long bar is a light bar. The same effort stretched over more days lands less load on each of them, which is often the quickest way to clear a red day.
Over 100% is normal to see, not a data error. A high marker simply means the hours booked into that day exceed the capacity of the row. It is the signal to reschedule, not a fault.
An overload also travels to the card: any task whose own share exceeds the day’s capacity turns red, which is the first rule in Which colour wins.