Hierarchy Properties
The top of the structure is whatever has no parent, found within the project and query above. The parent link role is read from the project’s own link role configuration, and falls back to
parent where no role is flagged as the parent role — a hierarchy linked by an unflagged role is still navigable level by level, but its top level comes up empty, because roots are detected from Polarion’s own indexed parent back-reference, which only flagged roles fill. Flag the role in workitem-link-role-enum.xml where the picker opens on nothing.
Standing the picker up is covered in Set Up a Hierarchical Resource Picker.
Which Field the Picker ReplacesThe picker renders on exactly one field: the effective team assignment resource field — the Resource Field widget parameter, or the project default
nextedy.gantt.workitems.default.resource_field where no widget carries the parameter. Every other field keeps its usual control.Identity Properties
These map a resource work item to a Polarion user, so a person reached as a resource and as an assignee occupies one row.
Configuring the mapping is covered in Map Resources to Polarion Users.
Declared Capacity Properties
A declared figure applies only to a resource that does not resolve to a Polarion user. A resource that does resolve to one takes that user’s working calendar and its declared figure is not read. The rule is the same in the resource view and in the Resource Capacity API.
Where the figure does apply, the calendar still decides the shape of the week: a non-working day carries no capacity whatever the field says, so schedule exceptions, holidays and vacations keep applying.
The resource view reads a declared figure only under the
perDay unit. Set perPeriodAbsolute and the figure is honoured by the capacity API but ignored on screen, where the resource falls back to its working calendar.
Declaring capacity is covered in Declare Resource Capacity in Hours per Day.
Resource Field and Grouping Properties
Grouping is covered in Group Resources by Team; the resource field itself in Configure Resource Fields.
Configuration Example
A structure in its own project, with containers that cannot be picked, identities declared on the resource work items, and each resource stating its own hours per day:Related Pages
- Resource Breakdown Structure — the model these properties configure
- Team and Resource Properties — the Team and Team Assignment work item types
- Resource Capacity API — reading capacity and allocation across projects
- Resource View Parameters — widget-level resource view settings
- Calendar and Working Hours Properties — the calendar layer declared capacity overrides