Set these properties in Administration > Configuration Properties.
Polarion Administration Configuration Properties page where Gantt default value properties are defined
Override HierarchyAdministration defaults apply system-wide. Once a widget is placed on a page, its own parameter values override these defaults. User preferences (zoom level, column widths) are saved in the browser and override both.

General Properties

Work Items Gantt Widget Defaults

These defaults apply to new Work Items Gantt widgets. Once a widget is added, its own parameter values are used.

Additional Defaults (Not Configurable Per Widget)

These properties control behavior at the server level and cannot be overridden on a specific widget instance.

Plans Gantt Widget Defaults

These defaults apply to new Plans Gantt widgets.

Default Client-Side Values

The Gantt widget ships with these built-in client-side defaults:

Configuration Example

To customize defaults for a Work Items Gantt deployment: