Skip to main content

Guides

Set Up the Resource View — Enable the resource view panel and configure load calculation modes, view height, and unassigned task visibility. Configure Resource Fields — Change which work item field drives the resource view, including custom enumeration and team fields. Set Up a Cross-Team Gantt Chart — Display teams as resource rows using a custom team field, showing team-level capacity without individual assignments. Set Up Team Assignments Gantt — Visualize per-user allocation percentages within teams using the Assignment Allocation load mode. Group Resources by Team — Collapse the resource list into one header row per team, each carrying the team’s own aggregated allocation. Set Up a Hierarchical Resource Picker — Replace the flat resource dropdown with a drill-down picker over a resource breakdown structure held as work items. Map Resources to Polarion Users — Merge a resource and the person assigned to tasks into one row, so their load is counted once rather than twice. Set Up a Release Gantt with Teams — Combine plan-based views with team resource allocation for release planning. Configure External Team Management Project — Source team and resource data from a separate Polarion project for cross-project capacity planning. Hide Inactive Resources — Automatically hide resources that have no tasks assigned in the current view. Mark Tasks Without Resource Allocation — Highlight unassigned tasks so unallocated work is visible during planning.
If you are new to resource management in the Gantt, begin with Set Up the Resource View to enable the panel, then explore team-based configurations as your needs grow.

See Also