Dashboard Purpose
The Program Manager Dashboard is designed for:- Program managers overseeing multi-disciplinary aerospace safety projects
- Certification authorities requiring evidence of compliance across standards
- Gate reviews and milestone decision points
- Executive stakeholder briefings on project health and risk posture
Key Metrics
The Program Manager Dashboard displays the following primary metrics:| Metric | Purpose | Data Source | Example (Aero1 FCC Project) |
|---|---|---|---|
| Overall Readiness % | System-level completion across all development phases and standards | Aggregated from requirement specs, risk specs, test specs | 68.3% |
| Requirement Decomposition % | Parent-child traceability completeness across customer → system → design levels | Requirements space: parent/child link coverage | 42.9% |
| Test Execution Progress % | Percentage of test cases executed (pass + fail) vs. planned | Test space: execution status distribution | 54.3% |
| Risk Control Implementation % | Risk controls implemented or in-progress vs. total identified | Risk space: risk control status filtering | 87.2% |
| Document Approval Status | Documents in approved/published state vs. total | Document workflow tracking (draft → approved → published) | 91.4% |
Readiness by Standard
The dashboard includes a 7-standard compliance scorecard showing certification readiness per aerospace standard:| Standard | Readiness Metrics | Evidence Tracking |
|---|---|---|
| ARP 4754A | System requirements classified (93%), decomposed (42.9%), verified (54.3%) | System Decomposition report, RTM PowerSheet |
| ARP 4761 | Failure modes analyzed (260 FM), risk controls implemented (87.2%), post-mitigation RPN scored (100%) | SFMEA/DFMEA risksheets, Risk Control Effectiveness report |
| DO-178C | Software requirements (0 current), design assurance level classification, verification objectives | DO-178C Compliance Matrix, Code Requirements spec |
| DO-254 | Hardware design requirements (15), DAL classification (93.3%), test coverage (40%) | Hardware Design spec, Design Verification report |
| MIL-STD-882E | Hazards identified and tracked (18 failure conditions), risk controls (214), post-mitigation assessment (100%) | Hazard Tracking risksheet, Common Cause Analysis |
| DO-160G | Environmental qualification status, test specifications | Environmental Testing spec |
| DO-326A | Security threats assessed, SAL levels assigned | Security Threat Assessment risksheet |
Dashboard Layout
Project Statistics Bar
The dashboard displays a project-wide statistics bar counting 9 primary work item types:| Artifact | Count (Aero1 FCC) | Tracked Via |
|---|---|---|
| System Elements | 12 | System decomposition tree |
| Customer Requirements | 25 | Customer Requirements space |
| System Requirements | 31 | System Requirements spec |
| Design Requirements | 15 | Design Requirements spec |
| Functions | 18 | Design Functions PowerSheet |
| Characteristics | 63 | Design Characteristics PowerSheet |
| Test Cases | 33 | Testing space test specifications |
| Failure Modes | 260 | SFMEA/DFMEA risksheets |
| Failure Conditions | 18 | FHA/PSSA/SSA safety assessments |
Additional metrics tracked on role-specific dashboards: Risk Controls (214), Compliance Objectives, Security Threats (SAL tracked), Hazards (MIL-STD-882E).
Compliance & Certification Readiness
Per-Standard Readiness Matrix
The dashboard includes a detailed readiness matrix with 5 coverage metrics per standard:| Standard | Classification % | Decomposition % | Test Coverage % | RPN Scored % | Doc Count |
|---|---|---|---|---|---|
| ARP 4754A | 93% | 42.9% | 54.3% | N/A | 11 |
| ARP 4761 | N/A | N/A | N/A | 100% | 26 |
| DO-178C | 0.0% | 100% | 40% | N/A | 4 |
| DO-254 | 93.3% | 100% | 40% | 100% | 11 |
| DO-160G | N/A | N/A | N/A | N/A | 4 |
| MIL-STD-882E | N/A | N/A | N/A | 100% | 26 |
| DO-326A | N/A | N/A | N/A | N/A | 1 |
- 🟢 Green: ≥80% complete
- 🟡 Orange: 50–79% complete
- 🔴 Red: <50% complete
- ⚪ Gray: Not applicable (N/A) for this standard
Metric Definitions
- Classification %: Requirements with required classification field populated / total requirements at that level
- Decomposition %: Requirements with parent-child traceability links / total requirements at that level
- Test Coverage %: Requirements with linked test cases / total requirements
- RPN Scored %: Failure modes with post-mitigation RPN value calculated / total failure modes
- Doc Count: Number of specification documents in the Requirements, Design, and Risk spaces
Some standards (DO-326A Security, DO-160G Environmental) may show N/A metrics if threat assessment or environmental testing has not yet been populated. Review the Certification Readiness Scorecard report for detailed evidence per objective.
Risk Posture Summary
The dashboard displays risk metrics aggregated from all failure mode analysis documents:| Metric | Formula | Aero1 FCC Example |
|---|---|---|
| High RPN (>30) | Failure modes with post-mitigation RPN > 30 | 3 modes |
| Medium RPN (11–30) | Failure modes with post-mitigation RPN 11–30 | 70 modes |
| Low RPN (≤10) | Failure modes with post-mitigation RPN ≤ 10 | 187 modes |
| Risk Controls Implemented | Risk controls with status = implemented or in-progress | 214 of 214 (100%) |
| Risk Control Coverage | Failure modes with at least one linked risk control | 98.5% of 260 FM |
Role Dashboard Summary Panels
The Program Manager Dashboard provides quick-access summary panels for each role’s key metrics:Safety Engineer Panel
- Failure condition count by ARP 4761 classification (Catastrophic, Hazardous, Major, Minor, No Effect)
- RPN distribution post-mitigation (High/Medium/Low counts)
- Risk controls pending implementation or verification
- FHA/PSSA/SSA/DFMEA document status
Design Engineer Panel
- Design requirement count and classification completeness (93.3% classified)
- Characteristics coverage per component
- DFMEA assignments (percent assigned vs. unassigned)
- Change request queue status
V&V Engineer Panel
- Test case execution status: pass, fail, not-run counts
- Verification coverage per requirement level (System Reqs: 61.3%, Design Reqs: 40%)
- Test-requirement traceability gaps
- Environmental qualification status
Configuration Manager Panel
- Total documents: 85 (across all spaces)
- Document approval status breakdown (draft, in-review, approved, published)
- Baseline tracking and version history
- Change request workflow status
Document Baseline Status
The dashboard displays document lifecycle status across all specification spaces:| Status | Count (Aero1 FCC) | Meaning |
|---|---|---|
| Draft | 5 | Under initial authoring; not yet reviewed |
| In Review | 7 | Awaiting approval by subject matter expert or certification authority |
| Approved | 63 | Reviewed and approved; ready for release to baselines |
| Published/Baselined | 10 | Released to configuration baseline; frozen for certification |
Quick Navigation Links
The Program Manager Dashboard includes a right-side quick-links sidebar with 4 navigation groups:Dashboards (6 links)
- Standards Compliance Overview
- Safety Assessment Summary
- Requirements Traceability
- Design Status
- Testing Progress
- Risk Management
Role Dashboards (7 links)
- Safety Engineer Dashboard
- Design Engineer Dashboard
- V&V Engineer Dashboard
- Configuration Manager Dashboard
- Program Manager Dashboard
- V-Model Process Guide
- Certification Readiness Scorecard
PowerSheets (5 links)
- Whole RTM (end-to-end customer req → test case traceability)
- ARP 4754A System Dev Assurance (requirements with DAL classification)
- Design Verification (design req → test case verification mapping)
- Component RTM (component-level design reqs and characteristics)
- User Need Validation (customer requirement validation)
Reports (12 links)
- Requirements Traceability (coverage and gaps by requirement level)
- V&V Summary (test execution and verification completeness)
- Risk Control Effectiveness (pre- vs. post-mitigation RPN comparison)
- System Decomposition (system/subsystem/component artifact inventory)
- FMEA Coverage Gaps (characteristics without failure mode analysis)
- HARA Risk Matrix (severity × likelihood assessment)
- FMEA Summary (design FMEA with RPN distribution)
- Compliance Matrix (DO-178C/DO-254 objective status)
- Security Threat Assessment (DO-326A STRIDE inventory)
- Common Cause Analysis (ARP 4761 CMA events)
- System Structure Navigator (interactive element tree with document links)
- Data Model (RTM entity types and relationships)
System Architecture Reference
The Program Manager Dashboard aggregates metrics from a multi-level system decomposition. The reference architecture (Aero1 Flight Control Computer) follows a 3-level hierarchy:The Program Manager Dashboard metrics are computed live via Velocity queries against work item counts and document status fields. Access the dashboard in Polarion at Project Home → Program Manager Dashboard or via the Dashboards quick-link menu.
Related Pages
- Project Home Dashboard — Document inventory and quick-link navigation hub
- Safety Engineer Dashboard — Safety-focused KPI dashboard
- Design Engineer Dashboard — Design requirement and characteristic status
- V&V Engineer Dashboard — Test execution and verification coverage
- Configuration Manager Dashboard — Document baseline and change tracking
- Certification Readiness Scorecard — Detailed per-standard readiness evidence
- RTM Domain Model — Work item types, fields, and relationships
- Risk Specification Document Workflow — Document lifecycle and approval process
Source References (dev)
Source References (dev)
Code:
.polarion/pages/spaces/_default/Program Manager Dashboard/page.xml, Safety Engineer Dashboard/page.xml, Design Engineer Dashboard/page.xml, VandV Engineer Dashboard/page.xml, Config Manager Dashboard/page.xml (0.52) · .polarion/pages/spaces/_default/Home/page.xml (0.48) · .polarion/pages/spaces/Requirements/Home/page.xml, Design/Home/page.xml, Risks/Home/page.xml, Testing/Home/page.xml, Risks/FMEA Reports/page.xml, Documentation/Home/page.xml, Documentation/Powersheet Help Redirect/page.xml, RiskTemplates/Home/page.xml (0.44) · datasets/sol-aero-ui-walkthrough/summary.md, navigation.md, dashboards/home-dashboard.md, dashboards/role-dashboards.md, dashboards/standards-compliance.md, risksheet-views/risksheet-views.md, work-item-types/data-model.md (0.39) · .polarion/hats/_default/portal/topics.xml, .polarion/hats/admin/portal/topics.xml (0.35)