The HARA workflow follows the ISO 14971 risk management process in six sequential steps: diagram

Workflow Guides

Follow these guides in order for a complete HARA analysis, or jump to a specific step:
  • Identify Hazards and Harm Scenarios Link hazards from the IEC 60601 hazard catalog, associate harms from the standard harms catalog, and describe the hazardous situation for each use step. This establishes the risk record’s hazard chain: Use Step —> Hazard —> Hazardous Situation —> Harm.
  • Evaluate Initial Risk (Pre-Mitigation) Score P1 (hazard probability) and P2 (harm probability) for each risk record. The risksheet calculates the composite probability and determines the pre-mitigation risk level using the 5x5 risk matrix.
  • Assign Risk Controls to Hazards Link risk controls from the Risk Control Plan to risk records. Controls follow the ISO 14971 hierarchy: inherent safety by design, then protective measures, then information for safety.
  • Evaluate Residual Risk (Post-Mitigation) After assigning controls, re-score P1 and P2 to reflect the reduced probabilities. Determine whether residual risk is Acceptable, requires Investigation, or remains Unacceptable.
  • Perform Benefit-Risk Analysis For risk records where post-mitigation risk is in the Investigation zone, document the clinical benefit and evaluate whether benefits outweigh residual risks per ISO 14971 clause 7.4.
  • Use Hazard and Harm Catalogs Browse the reusable Hazards Catalog (68 entries with IEC 60601 taxonomy) and Standard Harms catalog (25 entries with severity levels). Learn how to search, filter, and link catalog entries to risk records.

Prerequisites

Before starting HARA analysis, ensure:

Key Concepts

Understanding these concepts will help you work through the HARA guides effectively:
ConceptPage
The P1xP2 probability modelRisk Matrix and P1xP2 Probability Model
IEC 60601 hazard taxonomyIEC 60601 Hazard Taxonomy
Risk control priority orderISO 14971 Risk Control Hierarchy
When benefit-risk analysis is neededBenefit-Risk Analysis (Clause 7.2)

After HARA

Once all risk records have been evaluated and controls assigned: