Steps
- Navigate to the Control Plan Risksheet — Open the Control Plan document from the Risks space or from the Control Plans Report dashboard.
- Locate the Control Method row — Find the level 3 row for the control method you want to configure. This row will be nested under a characteristic (level 2), which is nested under a process step (level 1).
-
Set the Sample Size — In the “Sample Size” column, enter the number of parts to inspect per sampling event. Common values:
1for 100% inspection of critical characteristics5for periodic sampling of stable processesn=5, N=50for acceptance sampling plans (5 samples per 50-part lot)
-
Set the Sample Frequency — In the “Sample Frequency” column, specify when to perform inspections:
Every partfor SC/CC special characteristics requiring 100% inspectionHourlyfor in-process monitoring of process characteristicsFirst/last piece + 1/hrfor setup validation with periodic checksPer lotfor batch-based inspection strategies
- Verify the classification drives the plan — For rows with SC (Special Characteristic) or CC (Critical Characteristic) badges, ensure sample frequency reflects the criticality. SC/CC items typically require higher frequency or 100% inspection.
- Consider process capability — For stable processes with high Cpk (≥1.67), reduce sample frequency. For processes still under control (Cpk 1.00-1.33), increase frequency or sample size.
- Align with Detection Rating — Review the PFMEA detection rating for the linked failure mode. Higher detection ratings (6-10) indicate weak controls that may require increased sample frequency to compensate.
- Save the control plan — Click the save button in the risksheet toolbar. Changes apply immediately to the control plan configuration.
Workflow Diagram
| Decision Factor | Condition | Recommended Frequency |
|---|---|---|
| SC or CC classification | Classification = SC or CC | Every part OR First/last + hourly |
| Low process capability | Cpk < 1.33 | Increased (hourly or per shift) |
| High process capability | Cpk >= 1.67 | Reduced (daily or per lot) |
Sample Frequency Patterns
| Process Type | Cpk Range | SC/CC | Recommended Frequency | Sample Size |
|---|---|---|---|---|
| Setup/New run | N/A | Yes | First + Last + 1/hr | 5 |
| Setup/New run | N/A | No | First + Last | 3 |
| Stable process | ≥1.67 | Yes | Every part OR Hourly | 1 OR 5 |
| Stable process | ≥1.67 | No | Per shift | 5 |
| Marginal process | 1.00-1.33 | Yes | Every part | 1 |
| Marginal process | 1.00-1.33 | No | Hourly | 5 |
| Unstable process | <1.00 | Any | 100% until stable | 1 |
Verification
You should now see the “Sample Size” and “Sample Frequency” columns populated for each control method row. Critical characteristics (SC/CC) will have orange or red row backgrounds with higher frequency or 100% inspection specified. When you navigate to the Control Plans Report, the control plan metrics will reflect the number of control methods with documented sampling strategies.See Also
- Configure Measurement Methods — Define how to inspect the characteristic
- Define Reaction Plan — Specify corrective actions when out-of-spec
- Link to Characteristics — Establish characteristic-to-control-method relationships
- Process FMEA Risksheet Configuration — PFMEA detection ratings that drive control plan requirements
- PFMEA Detection Enumeration — Detection rating scale and control effectiveness